English
「language」
language
All languages
WhatsApp
+86-18601608662

Location: Home > News > Crushing knowlege > This page

Common Causes of Crusher Blockages and Troubleshooting

Release time:2026-05-18

156

Abstracts:

Crusher blockages are one of the most common and costly problems in crushing plants. They lead to downtime, reduced production, and even equipment damage. Understanding the root causes and how to troubleshoot them is essential for maintaining continuous operation.


1. Overfeeding and Improper Feed Control

The most common cause of blockages is overfeeding the crusher. When too much material enters the crushing chamber faster than it can be crushed, it accumulates and causes a jam.

Causes: Faulty feeders, unstable feed rates, or feeding oversized material beyond the crusher’s capacity.

Solutions: Install a variable speed feeder to match the crusher’s capacity; use a vibrating feeder with a grizzly bar to remove oversized material before it enters the crusher; control the feed rate according to the crusher’s load.

1779094138174401.jpg

2. Material Properties: Moisture, Clay and Sticky Materials

Materials with high moisture content or containing clay and sticky soil tend to clump together, sticking to the crusher walls and causing blockages.

Causes: Wet, sticky materials that cannot flow freely through the crushing chamber.

Solutions: Dry the material if possible; use a pre-screening process to remove fine, sticky material before feeding; adjust the crusher speed to improve material flow; use a crusher designed for sticky materials, such as a double-toggle jaw crusher.


3. Wear Parts and Crusher Condition

Worn or damaged wear parts can reduce the crushing efficiency and lead to blockages.

Causes: Worn jaw plates, cone liners, or impact blow bars that cannot effectively crush material, leading to oversized particles that jam the discharge gap; damaged crusher bearings or loose components that cause vibration and uneven crushing.

Solutions: Regularly inspect and replace worn wear parts; check for loose bolts and damaged components during maintenance; ensure the crusher is properly lubricated to maintain stable operation.


4. Incorrect Discharge Gap Setting

A discharge gap that is set too small for the feed material will cause oversized particles to get stuck in the crushing chamber.

Causes: Adjusting the gap too small without considering the feed size and material hardness.

Solutions: Re-adjust the discharge gap to match the feed size and material characteristics; for cone crushers, increase the closed side setting if blockages occur frequently.


5. Emergency Troubleshooting for Blockages

If a blockage occurs:

  1. Stop the crusher and feeder immediately, and lock out the power source.

  2. Never attempt to clear the blockage while the crusher is running.

  3. Use a hydraulic ram or air lance to clear the material safely.

  4. Identify the root cause (overfeeding, wear, material) before restarting the plant.


Most crusher blockages are preventable with proper feed control, regular maintenance, and correct equipment settings. By addressing the root causes and following safe troubleshooting procedures, you can minimize downtime and keep your crushing plant running efficiently.



Leave a message

107reservation successful

Hot news

Focused on mining machinery for 20 years

50R&D engineers

1000+user case representatives

41ypes of products are exported overseas

200+large and medium-sized digital devices

Customer case